Workshop „Physics Opportunities with Proton Beams at SIS100” was held in Wuppertal
PANDA meetings
04/03-08/03 2024 CM 24/1 in Münster
24/06-28/06 2024 CM 24/2 at GSI
25/06-26/06 2024 FEE/DAQ Workshop
04/11-06/11 2024 CM 24/3 at GSI
05/03-07/03 2025 WS at GSI
16/06-20/06 2025 CM 25 in Uppsala
The antiproton interaction with an internal 12C target inside the HESR ring at FAIR
Riccardo Introzzi
PA-PRO-2014-005.pdf
(555.4 KB)
In order to fulfill the goal of producing high rates of doubly strange hyperons the ¯PANDA
collaboration will use the antiproton ring HESR at the future facility FAIR. The low energy
hyperon production by an antiproton beam requires to insert a solid target inside the ring.
Unwanted side effects of such an insertion are the overwelming amount of annihilations, which
would make the detectors blind, and the fast depletion of the bunch, which circulates inside the
ring. The use of a very thin target and the technique of beam steering seem to be a satisfactory
solution to the above problems and will be described here.
collaboration will use the antiproton ring HESR at the future facility FAIR. The low energy
hyperon production by an antiproton beam requires to insert a solid target inside the ring.
Unwanted side effects of such an insertion are the overwelming amount of annihilations, which
would make the detectors blind, and the fast depletion of the bunch, which circulates inside the
ring. The use of a very thin target and the technique of beam steering seem to be a satisfactory
solution to the above problems and will be described here.